Platform capability
Site quality and construction control
Record inspections and findings, assign corrective work and follow each issue to closure. Site control stays connected to the relevant activity, responsible party and supporting documents.
Connected work
Turn an inspection into a resolved action
Keep the finding, the person responsible and the evidence of correction in one traceable workflow.
- Capture observationsRecord findings against the relevant work or location.
- Assign resolutionGive each issue a responsible person, due date and status.
- Review evidenceKeep comments, documents and responses with the finding.

In SODIS 360
What your team can do
These actions use the records and responsibilities already connected in the platform.
Capture observations
Record findings against the relevant work or location.
Assign resolution
Give each issue a responsible person, due date and status.
Review evidence
Keep comments, documents and responses with the finding.
Close the loop
See what remains open before work is accepted or handed over.
Connected capabilities
Works with the rest of your project
Open the functions that add context before or after this step.
Construction journals
Maintain general and special construction journals with links to work, design revisions and as-built document sets. Structured records make missing entries and contradictions easier to find before closeout.
Construction work schedule
Manage activities with planned dates, quantities, resources and progress. Each work item carries responsibility and can be linked to inspection and acceptance, so reported completion is checked against the work actually confirmed.
Tasks and assignments
Create assignments with owners, participants, reviewers, deadlines and discussion. Link each task to the document, asset, company or service request that explains why the work is needed.
Next step
See this capability in your workflow
Tell us what your team needs to manage. We can discuss the records, roles and steps needed for a useful configuration.